    ​​Oakland
    Reconstruction (B to Franklin)
    Complete


    Project Summary
    The project installed a new water main and reconstructed the street to be a consistent width. Sidewalks and ramps were upgraded to be compliant with the Americans with Disabilities Act, and bulb-outs were created at the Oakland and Franklin intersection to lessen the street crossing distance for pedestrians. Lastly, Street trees were planted to retain and soak stormwater into the ground to filter pollutants and reduce runoff entering natural bodies of water.

    Before


    After
    Engagement History
    Construction Preparation Meeting
    Tuesday, May 23, 2017 from 5:30 to 6:30 p.m.
    Cook Arts Center
    644 Grandville Ave SW
    Grand Rapids, MI 49503​