    Reconstruction (Michigan to Hastings)
    Complete


    Project Summary
    The project reconstructed Ottawa between Michigan and Hastings and reconfigured and widend the eastbound I-196 off-ramp to allow traffic to turn left and two lanes to turn right onto Ottawa. Ottawa north of the off-ramp was converted to one-way northbound and a new traffic signal was installed at the I-196 off-ramps to Ottawa. Traffic from both eastbound and westbound I-196 is now able to turn both left or right at the Ottawa and Michigan intersection. Sidewalks were upgraded to be compliant with the Americans with Disabilities Act and a rain garden was added at Ottawa and Hastings to retain and soak stormwater into the ground to filter pollutants and reduce runoff entering natural bodies of water.​​